PE Relining and Sliplining

Vinidex PE pipes have the chemical resistance properties and longitudinal flexibility to provide an ideal solution for relining existing corroded or damaged pipelines in water supply, sewers, and drain applications.

Existing pipelines used to transport aggressive and dangerous fluids may be restored by relining techniques, and cost-effective solutions are provided by eliminating the need for open cut trenches in urban and heavily built up areas. Installations can be planned around off-peak traffic periods to minimise disruption and reduce installation times.

Existing pipelines can be renovated by inserting Vinidex PE pipes into the old pipes. Insertion pipes can be pulled into position by mechanical winches.

Although insertion of the PE pipes will reduce the internal diameter of the pipeline, the effective flow capacity of the renovated line may in fact be greater than the existing installation due to the improved pipe wall friction factors of PE as compared to the existing pipe with heavily corroded or damaged internal surfaces. Inspection of the existing line should be performed by CCTV to provide data as to the actual likely flow friction factors.

Relining with PE pipes provides a structural element that is capable of withstanding either internal pressure or external loading without relying on the residual strength of the original degraded pipe elements.

PE Sliplining Trench Opening

The PE pipes require short length inlet and exit trenches to accommodate the PE pipe radius to lead into the existing pipeline, and the winch assembly used to pull the PE liner along the pipeline. The minimum bending radius of the PE liner is dependent on the SDR.

The dimensions of excavations required for slip lining are:

  1. Where the PE insert pipe is on the natural surface level
  2. Where the PE insert pipe is at a height H above the natural surface level

where:

H = depth to invert of existing pipeline
R = radius of liner pipe

Grouting

Grouting of the gap between the outside diameter of the PE liner, and the inside of the existing pipe is necessary only when the original pipe has been damaged to the extent that there is no residual external load capacity, or where manhole connections cannot be sealed off to prevent groundwater infiltration.

Where grouting is applied, the pressure should not exceed 50 kPa, and depending on the PN rating of the PE liner pipe, external collapse calculations should be carried out. Where cement-based grouts are used, the temperature rise in the PE liner due to the heat of hydration must be taken into account.

The PE liner pipes may be filled with water prior to grouting to increase the external pressure resistance, and to provide additional line weight to prevent the PE liner pipe floating during grouting and losing the final grade line.

Excavation

Sliplining existing pipes using Vinidex PE pipes allows for a reduction of excavation in built up areas.

Only the excavation necessary to feed the PE liner pipe into the existing line is required and depending on the total length of the line and the location of existing manholes, a liner length of approximately 100 metres may be drawn along the line in each section. For small diameter pipes, the PE can be supplied in Vinidex pipe reels. This allows for a single run of PE to be inserted into existing pipe without the need for intermediate jointing.

Where the existing service cannot be taken out of service, or temporarily blocked off during the relining process, extra excavation may be required to allow for the installation of a temporary diversion line.

Jointing the Liner

Depending on the diameter of the pipe, a single length of PE pipe can be installed to provide a single length of seamless liner.

Larger PE pipes can be butt welded above ground on site to provide a continuous length pipe which can be inspected for joint integrity before installation.

The butt weld process provides a joint which resists longitudinal load and has the same chemical resistance properties as the pipe. The external diameter weld bead sections may be mechanically removed prior to insertion to prevent any possibility of snagging on damaged sections, or protrusions, in the bore of the existing pipe to be relined. Where weld beads are removed, care must be taken not to notch the PE pipe wall. Butt welded joints must be allowed to cool to ambient temperature prior to drawing into the final position so as to prevent any damage to the joint section.

Safe Axial Pulling Loads

Safe Axial Pulling Loads for PE100 pipe
DN Safe Axial Pulling Loads (in kN) for PE100 pipe based on a tensile stress of 8MPa
SDR 41 SDR33 SDR26 SDR21 SDR17 SDR13.6 SDR11 SDR9 SDR7.4
50 2.9 3.5 4.3 5.2 6.2 7.5
63 3.7 4.5 5.7 6.9 8.3 10 11.8
75 4.2 5.3 6.5 8 9.6 11.7 14.1 16.7
90 6.1 7.6 9.3 11.5 13.8 16.9 20.3 24
110 9.1 11.4 13.9 17.2 20.7 25.1 30.2 36
125 11.9 14.5 17.9 21.9 26.8 32.5 39.1 46.4
140 7.3 14.7 18.3 22.4 27.5 33.6 40.6 49 58.3
160 9.5 19.1 24 29.5 35.9 44 53.4 63.9 76
180 12 24.1 30 37 45.5 55.7 67.4 80.8 96.1
200 15.7 30.2 37.2 45.9 56.3 68.5 83.2 100 118
225 19.4 37.8 46.8 58.1 71.3 86.9 105 126 150
250 24 46.9 58 71.2 87.5 107 130 156 185
280 30.3 58.7 72.4 89.8 110 134 163 196 233
315 38 74.4 92.1 113 139 170 206 248 294
355 47.4 94.3 117 144 177 216 261 314 374
400 59.5 120 148 183 224 274 332 399 474
450 75.7 151 187 232 284 347 421 504 600
500 96.1 186 231 286 350 428 519 623
560 121 235 290 358 440 537 650 781
630 151 296 367 452 556 679 823 989
710 188 377 467 576 707 863 1046 1257
800 238 478 592 730 897 1095 1326 1595
900 303 605 748 924 1138 1387 1680
1000 384 746 923 1142 1402 1690 2062
1100 485 895 1109 1380 1686 2046
1200 601 1073 1331 1643 1932 2465

 